Difference between revisions of "User:Dakota.Sullivan"
From REU@MU
(22 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
== Personal Info == | == Personal Info == | ||
− | Dakota Sullivan is a Computational Mathematics major at Marquette University. | + | Dakota Sullivan is a Computational Mathematics and Social Welfare and Justice double major at Marquette University. |
== Research Topic == | == Research Topic == | ||
Line 8: | Line 8: | ||
== Milestones == | == Milestones == | ||
+ | |||
+ | Weekly milestones can be found on our main project page, [[Using_Gaussian_Stochastic_Processes_(GaSP)_for_Hazard_Mapping#Milestones|located here]]. | ||
+ | |||
+ | == Daily Log == | ||
=== Week 1 (6/1 - 6/5) === | === Week 1 (6/1 - 6/5) === | ||
− | * | + | ==== Monday, June 1==== |
− | * | + | * Attended introductory session; learned about REU program |
− | * | + | * Met with [http://www.mscs.mu.edu/mscs/faculty/spiller.html Dr. Spiller] and research group members |
− | * | + | * Attended Systems lab orientation with [[User:Brylow|Dr. Dennis Brylow]] |
+ | * Took pre-REU NSF survey | ||
+ | * Began introductory reading on Gaussian Stochastic Process | ||
+ | |||
+ | ==== Tuesday, June 2==== | ||
+ | * Toured campus | ||
+ | * Filed paperwork with HR | ||
+ | * Attended library resources orientation with [http://www.marquette.edu/library/about/bio/james.php Heather James] | ||
+ | * Met with Dr. Spiller | ||
+ | |||
+ | ==== Wednesday, June 3==== | ||
+ | * Installed Python | ||
+ | * Met with Dr. Spiller to review Gaussian Stochastic Process | ||
+ | * Met with Dr. Brylow to learn about Marquette email and time keeping | ||
+ | * Tested optimization routines in Python | ||
+ | |||
+ | ==== Thursday, June 4==== | ||
+ | * Determined routine for plotting in Python | ||
+ | * Attended talk by Dr. Factor | ||
+ | * Met with Dr. Spiller | ||
+ | * Determined research goals and project timeline | ||
+ | * Continued developing optimization routine and plotting algorithms | ||
+ | |||
+ | ==== Friday, June 5==== | ||
+ | * Met with research group to finalize optimization algorithm | ||
+ | * Reviewed objectives of project | ||
+ | * Documented Goals and Milestones | ||
+ | * Downloaded LaTex | ||
=== Week 2 (6/5 - 6/12) === | === Week 2 (6/5 - 6/12) === | ||
− | |||
− | |||
− | |||
− | |||
− | === Week 3 ( | + | ==== Monday, June 8 ==== |
+ | * Met with Dr. Spiller | ||
+ | * Created methods to begin modeling maximum likelihood equation | ||
+ | * Developed a plot of our approximation in Python | ||
+ | |||
+ | ==== Tuesday, June 9 ==== | ||
+ | * Created maximum likelihood function | ||
+ | * Worked through difficulties with singularity in our matrices | ||
+ | * Plotted approximation of theta optimization | ||
+ | |||
+ | ==== Wednesday, June 10 ==== | ||
+ | * Corrected errors in the maximum likelihood function | ||
+ | * Determined optimal theta value | ||
+ | * Modified maximum likelihood equation to optimize multiple variables | ||
+ | |||
+ | ==== Thursday, June 11 ==== | ||
+ | * Developed variance function | ||
+ | * Listened to sample presentation by Dr. Factor | ||
+ | * Met with Dr. Spiller, updated her on our progress and discussed paper by [http://www.unc.edu/ims/luettich/jbikman/05_16_2012/Literature/A%20Basin%20to%20Channel-Scale%20Unstructured%20Grid%20Hurricane%20Storm%20Surge%20Model.pdf Westerink et al.] | ||
+ | |||
+ | ==== Friday, June 12 ==== | ||
+ | * Modified code to account for all approximated variables | ||
+ | * Tested our approximation methods for other functions | ||
+ | * Began reading Westerink et al. | ||
+ | |||
+ | === Week 3 === | ||
+ | |||
+ | ==== Monday, June 15 ==== | ||
+ | * Read through research paper (Westerink et al.) | ||
+ | |||
+ | ==== Tuesday, June 16 ==== | ||
+ | * Met with Dr. Spiller | ||
+ | * Introduced to additional notes on GaSP | ||
+ | * Attended talk by Dr. Brylow | ||
+ | |||
+ | ==== Wednesday, June 17 ==== | ||
+ | * Compared previous and new maximum likelihood equations | ||
+ | * Began developing a least squares model for our approximation | ||
+ | * Met with Dr. Spiller to discuss new maximum likelihood equation | ||
+ | |||
+ | ==== Thursday, June 18 ==== | ||
+ | * Completed Responsible Conduct of Research (RCR) training | ||
+ | * Began implementing new maximum likelihood equation | ||
+ | * Integrated least squares model into maximum into approximation | ||
+ | |||
+ | ==== Friday, June 19 ==== | ||
+ | * Finalized implementation of least squares model | ||
+ | * Tested approximation with multiple functions and inputs | ||
+ | * Added reference prior to maximum likelihood equation | ||
+ | * Met with Dr. Spiller | ||
+ | * Watched RCR training videos | ||
+ | |||
+ | === Week 4 === | ||
+ | |||
+ | ==== Monday, June 22 ==== | ||
+ | * Modified approximation function to allow multiple dimensions | ||
+ | * Developed algorithm to import test data | ||
+ | * Updated personal wiki page | ||
+ | |||
+ | ==== Tuesday, June 23 ==== | ||
+ | * Tested import algorithm | ||
+ | * Met with Dr. Spiller | ||
+ | * Searched for errors in code | ||
+ | * Modified m(x) and v(x) | ||
+ | |||
+ | ==== Wednesday, June 24 ==== | ||
+ | * Began optimizing theta for multiple dimensions | ||
+ | * Created algorithm for n-1 linear regressions | ||
+ | |||
+ | ==== Thursday, June 25 ==== | ||
+ | * Met with Dr. Spiller | ||
+ | * Attended talk by Dr. Spiller | ||
+ | * Modified Linear Regression | ||
+ | * Plotted new approximation | ||
+ | |||
+ | ==== Friday, June 26 ==== | ||
+ | * Tested various functions with approximation | ||
+ | * Cleaned/commented code | ||
+ | * Began optimization for n dimensions | ||
+ | |||
+ | === Week 5 === | ||
+ | |||
+ | ==== Monday, June 29 ==== | ||
+ | * Tested n-dimensional case with three parameters | ||
+ | * Outlined presentation | ||
+ | |||
+ | ==== Tuesday, June 30 ==== | ||
+ | * Met with Dr. Spiller | ||
+ | * Worked on presentation | ||
+ | |||
+ | ==== Wednesday, July 1 ==== | ||
+ | * Worked on presentation | ||
+ | * Read “A Framework for Validation of Computer Models” | ||
+ | |||
+ | ==== Thursday, July 2 ==== | ||
+ | * Finalized presentation | ||
+ | * Attended presentations | ||
+ | |||
+ | === Week 6 === | ||
+ | |||
+ | ==== Monday, July 6 ==== | ||
+ | * Met with Dr. Spiller | ||
+ | * Read through Step 5 of “A Framework for Validation of Computer Models” | ||
+ | * Identified unknowns in process | ||
+ | |||
+ | ==== Tuesday, July 7 ==== | ||
+ | * Planned out MCMC example solution | ||
+ | * Programmed MCMC solution | ||
+ | |||
+ | ==== Wednesday, July 8 ==== | ||
+ | * Worked on MCMC Weibull Example | ||
+ | * Read through “Posterior Models and MCMC” | ||
+ | * Worked on Beetle Mortality Example | ||
+ | |||
+ | ==== Thursday, July 9 ==== | ||
+ | * Met with Dr. Spiller | ||
+ | * Altered Code for Weibull Example | ||
+ | * Plotted posterior function against MCMC histogram | ||
+ | |||
+ | ==== Friday, July 10 ==== | ||
+ | * Attempted to use GaSP Approximation to determine bias function | ||
+ | * Obtained estimate for bias | ||
+ | * Finished Weibull Example | ||
+ | |||
+ | === Week 7 === | ||
+ | |||
+ | ==== Monday, July 13 ==== | ||
+ | * Updated Wiki | ||
+ | * Completed RCR quizzes | ||
+ | * Identified problems in current code | ||
+ | * Met with Dr. Spiller | ||
+ | * Attempted to remove noise from function approximation | ||
+ | |||
+ | ==== Tuesday, July 14 ==== | ||
+ | * Completed thinning algorithm | ||
+ | * Verified accuracy of MCMC method | ||
+ | * Searched for errors within bias function | ||
+ | * Met with Dr. Spiller | ||
+ | |||
+ | ==== Wednesday, July 15 ==== | ||
+ | * Searched for cause of high variance | ||
+ | * Adjusted minpoint method | ||
+ | * Printed all variance values | ||
+ | * Plotted optimization function | ||
+ | * Verified that problem exists within the maxprior function | ||
+ | |||
+ | ==== Thursday, July 16 ==== | ||
+ | * Met with Dr. Spiller | ||
+ | * Plotted approximation without prior | ||
+ | * Tested x matrix as a vector of ones | ||
+ | * Attended work lunch and presentation | ||
+ | |||
+ | ==== Friday, July 17 ==== | ||
+ | * Determined correct alpha values | ||
+ | |||
+ | === Week 8 === | ||
+ | |||
+ | ==== Monday, July 20 ==== | ||
+ | * Met with Dr. Spiller | ||
+ | * Tested alpha values for approximation and bias functions | ||
+ | * Started outline for poster | ||
+ | |||
+ | ==== Tuesday, July 21 ==== | ||
+ | * Reviewed Bayari paper | ||
+ | * Worked on presentation | ||
+ | |||
+ | ==== Wednesday, July 22 ==== | ||
+ | * Met with Dr. Spiller | ||
+ | * Fixed maximum likelihood equation | ||
+ | * Created MCMC algorithm | ||
+ | |||
+ | ==== Thursday, July 23 ==== | ||
+ | * Worked on latin hypercube algorithm | ||
+ | * Work lunch and talk | ||
+ | * Modified MCMC algorithm to work with two dimensions | ||
+ | |||
+ | ==== Friday, July 24 ==== | ||
+ | * Modified MCMC algorithm for n dimensions | ||
+ | * Worked on presentation | ||
+ | |||
+ | === Week 9 === | ||
+ | |||
+ | ==== Monday, July 27 ==== | ||
+ | * Worked on presentation | ||
+ | |||
+ | ==== Tuesday, July 28 ==== | ||
+ | * Worked on presentation | ||
+ | * Outlined research paper | ||
+ | |||
+ | ==== Wednesday, July 29 ==== | ||
+ | * Finalized presentation | ||
+ | * Worked on abstract | ||
− | * | + | ==== Thursday, July 30 ==== |
− | ** | + | * Worked on research paper |
− | * | + | * Submitted abstract |
+ | * Met with Dr. Spiller | ||
+ | * Continued to work on research paper | ||
− | === | + | ==== Friday, July 31 ==== |
− | * | + | * Worked on presentation |
− | * | + | * Worked on research paper |
− | * | + | * Tested MCMC algorithm |
− | + | ||
− | === Week | + | === Week 10 === |
− | + | ||
− | + | ||
− | + | ||
− | === | + | ==== Monday, August 3 ==== |
− | * | + | * Met with Dr. Spiller |
− | * | + | * Worked on presentation |
− | * | + | * Tested MCMC algorithm |
− | === | + | ==== Tuesday, August 4 ==== |
− | * | + | * Met with Dr. Spiller |
+ | * Worked on presentation | ||
+ | * Attended poster presentations | ||
− | === | + | ==== Wednesday, August 5 ==== |
− | * | + | * Finalized presentation |
+ | * Attended presentations | ||
− | === | + | ==== Thursday, August 6 ==== |
− | * | + | * Attended presentations |
+ | * Worked on MCMC algorithm | ||
− | === | + | ==== Friday, August 7 ==== |
− | * | + | * Took post-REU Survey |
+ | * Attended final meeting with Dr. Spiller |
Latest revision as of 18:13, 19 August 2015
Contents
Personal Info
Dakota Sullivan is a Computational Mathematics and Social Welfare and Justice double major at Marquette University.
Research Topic
Using statistical surrogates to estimate the behavior of storm surge during a hurricane or tropical storm. See here for more details.
Milestones
Weekly milestones can be found on our main project page, located here.
Daily Log
Week 1 (6/1 - 6/5)
Monday, June 1
- Attended introductory session; learned about REU program
- Met with Dr. Spiller and research group members
- Attended Systems lab orientation with Dr. Dennis Brylow
- Took pre-REU NSF survey
- Began introductory reading on Gaussian Stochastic Process
Tuesday, June 2
- Toured campus
- Filed paperwork with HR
- Attended library resources orientation with Heather James
- Met with Dr. Spiller
Wednesday, June 3
- Installed Python
- Met with Dr. Spiller to review Gaussian Stochastic Process
- Met with Dr. Brylow to learn about Marquette email and time keeping
- Tested optimization routines in Python
Thursday, June 4
- Determined routine for plotting in Python
- Attended talk by Dr. Factor
- Met with Dr. Spiller
- Determined research goals and project timeline
- Continued developing optimization routine and plotting algorithms
Friday, June 5
- Met with research group to finalize optimization algorithm
- Reviewed objectives of project
- Documented Goals and Milestones
- Downloaded LaTex
Week 2 (6/5 - 6/12)
Monday, June 8
- Met with Dr. Spiller
- Created methods to begin modeling maximum likelihood equation
- Developed a plot of our approximation in Python
Tuesday, June 9
- Created maximum likelihood function
- Worked through difficulties with singularity in our matrices
- Plotted approximation of theta optimization
Wednesday, June 10
- Corrected errors in the maximum likelihood function
- Determined optimal theta value
- Modified maximum likelihood equation to optimize multiple variables
Thursday, June 11
- Developed variance function
- Listened to sample presentation by Dr. Factor
- Met with Dr. Spiller, updated her on our progress and discussed paper by Westerink et al.
Friday, June 12
- Modified code to account for all approximated variables
- Tested our approximation methods for other functions
- Began reading Westerink et al.
Week 3
Monday, June 15
- Read through research paper (Westerink et al.)
Tuesday, June 16
- Met with Dr. Spiller
- Introduced to additional notes on GaSP
- Attended talk by Dr. Brylow
Wednesday, June 17
- Compared previous and new maximum likelihood equations
- Began developing a least squares model for our approximation
- Met with Dr. Spiller to discuss new maximum likelihood equation
Thursday, June 18
- Completed Responsible Conduct of Research (RCR) training
- Began implementing new maximum likelihood equation
- Integrated least squares model into maximum into approximation
Friday, June 19
- Finalized implementation of least squares model
- Tested approximation with multiple functions and inputs
- Added reference prior to maximum likelihood equation
- Met with Dr. Spiller
- Watched RCR training videos
Week 4
Monday, June 22
- Modified approximation function to allow multiple dimensions
- Developed algorithm to import test data
- Updated personal wiki page
Tuesday, June 23
- Tested import algorithm
- Met with Dr. Spiller
- Searched for errors in code
- Modified m(x) and v(x)
Wednesday, June 24
- Began optimizing theta for multiple dimensions
- Created algorithm for n-1 linear regressions
Thursday, June 25
- Met with Dr. Spiller
- Attended talk by Dr. Spiller
- Modified Linear Regression
- Plotted new approximation
Friday, June 26
- Tested various functions with approximation
- Cleaned/commented code
- Began optimization for n dimensions
Week 5
Monday, June 29
- Tested n-dimensional case with three parameters
- Outlined presentation
Tuesday, June 30
- Met with Dr. Spiller
- Worked on presentation
Wednesday, July 1
- Worked on presentation
- Read “A Framework for Validation of Computer Models”
Thursday, July 2
- Finalized presentation
- Attended presentations
Week 6
Monday, July 6
- Met with Dr. Spiller
- Read through Step 5 of “A Framework for Validation of Computer Models”
- Identified unknowns in process
Tuesday, July 7
- Planned out MCMC example solution
- Programmed MCMC solution
Wednesday, July 8
- Worked on MCMC Weibull Example
- Read through “Posterior Models and MCMC”
- Worked on Beetle Mortality Example
Thursday, July 9
- Met with Dr. Spiller
- Altered Code for Weibull Example
- Plotted posterior function against MCMC histogram
Friday, July 10
- Attempted to use GaSP Approximation to determine bias function
- Obtained estimate for bias
- Finished Weibull Example
Week 7
Monday, July 13
- Updated Wiki
- Completed RCR quizzes
- Identified problems in current code
- Met with Dr. Spiller
- Attempted to remove noise from function approximation
Tuesday, July 14
- Completed thinning algorithm
- Verified accuracy of MCMC method
- Searched for errors within bias function
- Met with Dr. Spiller
Wednesday, July 15
- Searched for cause of high variance
- Adjusted minpoint method
- Printed all variance values
- Plotted optimization function
- Verified that problem exists within the maxprior function
Thursday, July 16
- Met with Dr. Spiller
- Plotted approximation without prior
- Tested x matrix as a vector of ones
- Attended work lunch and presentation
Friday, July 17
- Determined correct alpha values
Week 8
Monday, July 20
- Met with Dr. Spiller
- Tested alpha values for approximation and bias functions
- Started outline for poster
Tuesday, July 21
- Reviewed Bayari paper
- Worked on presentation
Wednesday, July 22
- Met with Dr. Spiller
- Fixed maximum likelihood equation
- Created MCMC algorithm
Thursday, July 23
- Worked on latin hypercube algorithm
- Work lunch and talk
- Modified MCMC algorithm to work with two dimensions
Friday, July 24
- Modified MCMC algorithm for n dimensions
- Worked on presentation
Week 9
Monday, July 27
- Worked on presentation
Tuesday, July 28
- Worked on presentation
- Outlined research paper
Wednesday, July 29
- Finalized presentation
- Worked on abstract
Thursday, July 30
- Worked on research paper
- Submitted abstract
- Met with Dr. Spiller
- Continued to work on research paper
Friday, July 31
- Worked on presentation
- Worked on research paper
- Tested MCMC algorithm
Week 10
Monday, August 3
- Met with Dr. Spiller
- Worked on presentation
- Tested MCMC algorithm
Tuesday, August 4
- Met with Dr. Spiller
- Worked on presentation
- Attended poster presentations
Wednesday, August 5
- Finalized presentation
- Attended presentations
Thursday, August 6
- Attended presentations
- Worked on MCMC algorithm
Friday, August 7
- Took post-REU Survey
- Attended final meeting with Dr. Spiller